Construction machinery equipment accessories compressor air compressor filter element 1622065800 air filter
Description:
1. Wider pleat width
2. High filtration efficiency
3. Filter Material: 80% Cellulose + 20% Polyester
4. Excellent ability for moisture protection
5. Top open, bottom open/bottom close with deflating bolt hole
6. Galvanized stainless metal configuration
The compressed air is the main security energy in the large-scale industrial production, so precision filtration of the air is particularly important.
Air filter is widely used to filter out the impurities in the air, such as oil, water, solid particles and so on, if we do not remove these impurities, they will affect the service life of the equipment, and even threaten the normal operation of the system.
Specifications:
Type | Air filter elelment | |||
Filtration Efficiency | 99.7% | |||
Certificate | ISO9001 | |||
Working medium | Air/ Dust | |||
Material | filter paper | |||
Market | Global | |||
Place of Origin | Made in China, Hebei, Langfang | |||
Brand | POKE | |||
Delivery time | 7 days | |||
Model | 1622065800 SA 19382 | |||
Shipment |
|
Related Models:
612600190646 | 612600190763 | 612600190993 |
612600190993 | RK CLS110-10LU | LFG-52X74E0.3 |
P2.0933-01 | P30.52051 | S2.1023-08 |
V2.1217-08 | V3.0617-06 | V5.1240-06 |
32-925694 | 581-18096 | 32-925694 |
TFX-400×10 | TFX(ZX)-630×100 | TFX-800×180 |
TLX245G | FBX-800×20 | CS-050A10-A |
10440983 | 230962 | 243622 |
946437Q | 944918Q | 944890Q |
944894Q | 944915Q | 937070Q |
937953Q | 938955Q | 944817Q |
HOT SELLING FILTERS AS FOLLOWS | ||||
1R-0735 | 1397764 | LF691A | 2992300 | 26510337 |
1R-0740 | 1397765 | LF700 | 2992242 | 26510342 |
1R-0749 | 1397766 1784782 | LF699 | 2992241 | 26510380 |
1R-0750 | 1450184 | LF716 | 2994057 | 26510211 |
1R-0755 | 1821580 | LF701 | 2992261 | 26510362 |
1R-1808 | 1699168 | LF747 | 2997305 | 135326205 |
1R-0659 | 1948921 | LF9009 | 500054702 | 135326206 |
1R-0716 | 2120279 | FF167 | 5801317097 | 26560163 |
1R-0722 | 1819795 | FF171 | 2994048 | 26560201 |
1R-0724 | 1433649 | FF182 | 504170771 | 7111-296 |
1R-0728 | 1925363 | FF183 | 42558096 | 7111-796 |
1R-0739 | 1922496 | FF185 | 42558097 | 1117285 |
1R-0746 | 1843659 | FF214 | 2997378 | 2059778 |
1R-0751 | 2014774 | AF26664/ AF27843 | 2995711 | 1518512 |
1R-0753 | 1852005 | AF975M/ AF976 | 2997305 | 1763776 |
1R-0762 | 1931685 | AF25267/68 | 2992544 | 1873018 |
1R-0769 | 1363025 | AF25270/71 | 1907582 | 1873016 |
1R-0770 | 1317409 | AF25492/91 | 1901929 | 1372444 |
1R-0771 | 1433690 | AF25497/AF25436 | 1902138 | 1780730 |
1R-1807 | LF14000NN | AF25539 | 1907640 | 2022275 |
1R-0729 | LF16011 | AF25553 | 2992188 | 153468 |
Factory Profile
Yuanbang Filtration Technology (Langfang) Co., LTD., founded in 2004. Over the years, we have been keen to serve every customer, customized professional products for different customers, to provide the best pre-sale and after-sales service.
The company is located in Langfang, known as the Beijing-Tianjin corridor. Is a research and development, production, sales, service in one of the modern enterprises.Products are widely used in metallurgy, petroleum, chemical industry, electric power, coal, mining, pharmaceutical, beverage, food electronics, construction machinery and other industries.
FAQ
1. What’s Minimum Order Quantity ?
Each item has a minimum order quantity, which would be stated in our quote sheet.
2. What’s kind of your packaging ?
Neutral Carton packaging or accordimng to customer’s requirements.
3. Could I get some samples? How could I pay the sample payment ?
We are honored to offer you samples. We accept the sample payment via Western Union or T/T .
4. How long is your Delivery Lead Time ?
If there is stock, we can arrange goods at once after we get the payment .
If need to be produced, 5-7 working days after receiving payment .
5. Price:
All prices and terms are quoted in US dollars FOB Qingdao or CIF your port. Prices are valid for 1 month.
6. Minimum order quantity:
There is a minimum order quantity for each product, which will be indicated in our quotation. Items are negotiable.
7. Delivery cycle:
If there is stock, the delivery date will be about a week after we receive the payment, if we need production, it will be 7 days after we receive the advance payment request.